About Us

As YURT Enerji Üretim Sanayi ve Ticaret A.Ş., we operate in Kumluca district of Antalya with three HEPP.

ALAKIR HEPP projected to generate electricity by feeding from Alakır Dam, was commissioned in 1971 at Finike-Kumluca. A electricity generation license is given to our plant for 49 years as of 20.03.2008 in Alakır HEPP with the Water Use Right Agreement dated 12.03.2008 with General Directorate of D.S.İ. (State Hydraulic Works) and the Generation License dated 20.03.2008 and numbered EÜ/1539-4-1122.  The facility was completed on 19.11.2009, its provisional  acceptance was granted by EMRA on 29.01.2010, and the commercial activity started on the same day.

KOZDERE HES is located in the Kumluca District of Antalya. It is one of the energy projects included to “West Mediterranean Basin Reconnaissance Survey Report 1962” developed by General Directorate of D.S.İ..  KOZDERE HEPP project was granted the Generation License dated 24.01.2013 and numbered EÜ/4249-2/2533. The construction of the facility was completed on 03.10.2011. The plant was commissioned after the “Provisional Acceptance" of Unit-1 was made on 08.10.2011.

An electricity generation license is granted for 49 years as of 17.08.2008 to TOCAK-1 HEPP with the Water Use Right Agreement drawn up with General Directorate of D.S.İ. dated 03.08.2007 and the Generation License dated 17.08.2007 and numbered EÜ/1280-2/919.  The construction of the facility was completed on 20.03.2009. The provisional acceptance of the plant was granted by the committee appointed by the MENR on 08.05.2009.